Mira Costa High School

PV System Size: 620kW

Project Owner: Manhattan Beach USD
Location: Manhattan Beach, CA
Customer: 4 S.T.E.L. Engineering

Year Completed: 2014

This project consists of a 620kW PV system split between solar mounted carports and a rooftop for Mira Costa High School. In addition to the electrical design of the PV system, light poles were demolished and new under-canopy lighting was designed in its place. Title 24 calculations were required for this project. Dersch Design acted as the electrical engineer of record for this project which needed to be permitted through DSA. 

PV System | Roof Mount | Carport |

Title 24 Compliant Lighting