Ft. Rosecrans Cemetery
PV System
PV System Size: 64kW
Project Owner: GSA
Location: San Diego, CA
Customer: GSA
Year Completed: 2012
This engineering project consists of a ground mounted PV system and associated electrical equipment. Coordinated entire design team and acted as Designer of Record and final QC authority for this design-build construction project.
Analyzed the site electrical usage and proposed a PV system size which would generate enough
electricity during the daylight hours to offset all the power consumed on-site. Coordinated with geotechnical engineer and structural engineer for all foundation and layout designs.