Ft. Rosecrans Cemetery 

PV System

PV System Size: 64kW
Project Owner: GSA
Location: San Diego, CA
Customer: GSA

Year Completed: 2012

This engineering project consists of a ground mounted PV system and associated electrical equipment.  Coordinated entire design team and acted as Designer of Record and final QC authority for this design-build construction project.
 

Analyzed the site electrical usage and proposed a PV system size which would generate enough
electricity during the daylight hours to offset all the power consumed on-site.  Coordinated with geotechnical engineer and structural engineer for all foundation and layout designs.

 

 

 