Ft. Irwin NTC

Telemetry Implementation

Project Owner: U.S. Army
Location: Ft. Irwin, CA
Customer: Barkley Andross Corporation

Year Completed: 2016

‚Äč

Due to utility requirements, Ft. Irwin was required to implement real-time telemetry for all grid connected distributed generation. The project consisted of implementing a communication path from eight PV systems scattered across Fort Irwin to a central location where the requested data is concentrated and delivered to Southern California Edison.
Acted as engineer of record, final QC authority, and coordinated closely with base personnel in order to utilize existing fiber infrastructure and reduce installation costs.

SCE Telemetry Implementation

© 2013-2019 by Dersch Design & Engineering  All Rights Reserved.

  • LinkedIn Social Icon
  • Twitter Social Icon
  • Facebook Social Icon